Thursday, 7 August 2014

Odd jobs and maintenance.

Wednesday 6th August.

There is something infinitely pleasurable about waking up 'afloat' and laying in bed listening to the sounds of the marina as it wakes up. With the quacking of the ducks, the distant throb of a boat engine, and the shimmer of the sunshine reflected off the water through the curtains onto the ceiling of the boat.
I decided to catch up on some odd jobs today so after showering, and breakfast I sorted out some storage boxes under the bed.
The idea was during summer to store winter clothes and during winter to store summer clothes. Unfortunately the 'tools' took over and filled all the boxes. Having found new homes for the tools I am now able to revert to the original plan.
The tools haven't gone far, just into the drawers below the boxes.

Next job was to screw some cup hooks under a shelf, thereby freeing up the shelf for more of the same.



 I've not been looking forward to the next job.
Where the chimney flue goes into the collar on the top of the solid fuel stove, the fire cement has been cracked and crumbly for quite a while, so as the fire is not in use at present it seemed like a good time to chisel all the old stuff out and re-seal it with new.
A very messy job, but with the aid of the trusty vacuum cleaner, a hammer and a chisel (old screwdriver) I got it sorted. Then it was merely a job of replacing the cement with new stuff and smoothing it round with a wet knife.
Having done that, I thought how scruffy the fire was looking, so out came the wire brush and the vacuum (again) closely followed by the high temperature paint! (amazing how these jobs 'snowball' isn't it)

Just the door to paint now, shame the glass won't stay that clear when
the fire is in use.

Looking much better with first coat of paint. The streak marks on the chimney flue are actually etched into the steel, hopefully they'll fade with the next coat of paint.

Wednesday, 6 August 2014

Heavily laden

Tuesday 5th August

I drove up from Kent  with a fully laden Polo . Not a bad journey at just 3 hours, and just the usual go slow around junction 13 Milton Keynes.
The car was stacked to the roof with boxes and the boot was full too. I was wondering where the devil I was going to put it all on Bracken but amazingly I found homes for the majority of stuff and only had to farm one box out to Jenny!
There are two more car loads to come, although one of them consists of furniture which is not coming to the boat but is being 'donated' to Graham and Jenny, that way keeping it in the family. Then the final load will be when I move up here permanently at the end of the month.
After a visit to Graham and Jaq's for some of Jaq's tasty chilli, I popped down to surprise Jenny as she didn't know i was coming up. Then, as I was pretty tired it was back to the boat for bed.

Wednesday 6th August.

A good nights sleep apart from the heavy rain drumming on the roof.
Shower, (still works), breakfast, (bacon and eggs), followed by a cup of coffee. Lovely start to the day and now for some unpacking.
Starting to feel a bit more cluttered homely.





Sunday, 27 July 2014

Busy in a leisurely way.

As the title says, I've been busy....... not dashing about like a mad thing, but steady with little periods of sitting and contemplating.
I decided to attempt to get the shower working on Bracken. The taps work ok, as in water comes out of the shower head when turned on. The hot tap even gives out hot water, (as long as the pilot light on the Paloma  is lit first. However, the drain pump has never worked, there is no way of emptying the shower tray except with a scoop into a bucket followed by mopping with towels. Consequently I've not used it so far. Also the socket that the shower head fits into was broken and so had to be held.
Not a great hardship as the shower block in the marina is fine, and what's more they're free to use for moorers.





I started with my multimeter to ascertain that there was electrickery getting to the on/off switch in the toilet compartment.  There was.
Then checked there was power getting to the pump, again there was. I also noticed the body of the pump was very hot to the touch. Tapping the body of the pump didn't make any difference, (thought it might be 'stuck'), so time to extract the offending article and dismantle it.
The pump was situated right at the back of the sink unit, not the easiest place to reach but laying on my back with my head under the unit I was able to get at the hose connections and wiring terminal block
Pump removed, I started to dismantle it.
Oh dear, what a sorry state!
The rotor and motor armature were seized solid, and when i separated the motor from the pump body a load of gooey, rusty crud appeared.










A pretty sorry state. I've not managed to remove the pump from the rotor, it appears to be totally seized so I'll save that for another day. ( maybe a day when I've nothing better to do), I wont throw it away, 'cos you never know when it might come in use.
Fortunately I had a spare pump from the pressure system, so after changing the fittings over to screw-on I was able to install it in place.

Connected up and bingo! A working shower drain pump. The yellow pipe comes from the shower tray, and the red pipe leads to the skin fitting out through the hull.
Next job to fix a socket on the riser rail for the handset to fit into.



A  trip to B & Q at Cannock where I bought  a  Mira handset socket and a length of chromed copper pipe of  22 mm diameter. I cut a length off the chromed pipe to the same length of the present riser rail and slid it over the old rail. That way the new Mira socket  would fit on the old riser rail. It works anyway, and I've had several successful showers since. :)

Jenny came up for breakfast bacon butties this morning, and the doting parents brought their offspring round. Its all part of the training on how to beg the most grub by looking really appealing. Seems to work for them, they got through half a bag of duck and swan treats food!




I need to return to Kent tomorrow to continue disposing of my furniture in preparation for moving aboard Bracken. So see you in a couple of weeks or so when I bring another car load of possessions up.





Monday, 21 July 2014

Some fettling and a lick of varnish.

Monday 21st July.

A slightly restless night due to the heat. I'm not going to complain 'cos there will come a time when I'll be longing for warmer weather I'm sure.
After ablutions, followed by breakfast, I did some measuring up for the bookshelves. Out came the trusty saw, drill, tools etc and I set to. One advantage of a cruiser deck is that there is plenty of room to work and it keeps the mess outside and not treading through 'indoors'. Also, the storage boxes make excellent work benches.
The shelves I acquired from Jenny's boss were a little too long and were well weathered from being outside. No problem though, after cutting them down to length, and a good sanding down, followed by 3 coats of varnish, they look a treat.
 The hot weather certainly aided the drying process, and I was glad to get the job done before the hottest part of the day. That left me free to enjoy a lazy afternoon, staying out of the sun and having a good read.

Next trip I bring books!

Sunday, 20 July 2014

Saturday and Sunday

After Friday nights thunder and lightning storm, Saturday was a day of dodging showers.
Graham and Jaq were out Saturday night so I went down to Jennies and enjoyed sharing a take away with Jenny, Peter and Sam. A lovely eve was had by all, with lots of chat and catching up and no tele!
I slept like a log that night, and it was only my alarm that woke me Sunday morning. It was a beautiful morning and so  after a wander down to the shower block I came back and did myself bacon and eggs for breakfast, followed by a cup of coffee. What a perfect way to start the day!
After washing up, I washed a few 'smalls' out and hung them on an airer on the well deck to dry. Then i spent some time catching up with the blog till Graham phoned and invited me to join them for lunch at the 'Wych Elm carvery in Burntwood. Nice meal and quite generous portions too.
Jenny had text me to let me know she'd found a set of shelves she thought I could do something with so I popped down to where she works and picked them up. With a little fettling they'll do nicely.


Tomorrows project, then I'll have somewhere to put some of my books when I bring them up, I do so love a good read. :)

Where I love to be.

Friday 18th July.

It was the usual slow trip up the M1 from Kent. It always seems to be around junction 13, the traffic gets slower and slower, then its stop start, stop start. In the heat of Friday it was not a pleasant trip at all. Especially in a Polo with no aircon. 
In all, it took about 4 hours to get to Lichfield, then a wander round Morrisons for some 'vittals' and then on to Kings Bromley Marina.
How lovely to be back aboard 'Bracken'. Going down the steps into the saloon and opening up the boat was like stepping into an oven. Where all the windows and doors had been closed it was incredibly hot in there.
Once the front doors and rear doors were open a nice cooling breeze blew through the boat and it soon became more comfortable. I'm so glad that all eight windows on Bracken have hopper type vents on them, it lets a little more ventilation in, or maybe lets the hot air out.

Preparing to move.

I had a full car this trip. I've spent the weeks since my last visit clearing out cupboards at my bungalow and disposing of possessions in preparation for moving onto Bracken permanently.
 Hopefully this will happen around the beginning of September, but my god there's some stuff to move before then!
The logistics are simple, I'm moving from a detached, two bedroom bungalow with kitchen, bathroom and with garden sheds, to a 40 feet cruiser stern Narrowboat.... Simples!!
Sorting stuff is easy. You empty a cupboard....... you look at the mountain of stuff before you.......... you exclaim loudly " so that's where it went,"  'it' being an object you filed away so long ago you had forgotten you owned it! Then you wonder how you've managed to go so many years without said object, then you put it on the pile.
There are 2 piles,
Ist pile is  To keep.
Second pile is  To Dispose of.
Obviously the first pile should be the smallest, that way you have less stuff to transport 200 miles from Kent to Boat.
The second pile is the difficult one. This pile can be divided into numerous other piles. Like:-
Rubbish, take to the tip.
Rubbish, might be saleable though.
Junk,  might be saleable though.
Junk, see if anyone in the family want it.
Junk, donate to charity shop.
Not forgetting another slightly embarrassing pile.
Items you borrowed off your best mate all those years/months ago, and you were SO sure you had given him/her back And you told them repeatedly you'd given it back and they must have leant it to someone else who had'nt returned it cos you'd definitely returned it.
Now you have to make a decision, do you  (a) fess up and say to your mate "hey buddy, look what i found. Or do you say nothing, and place it on one of the other piles, after all, he/she had already accepted the loss and probably replaced it with a new 'it' anyway.
Decisions decisions :)

So i have brought with me numerous items from the first pile, consisting of Kitchen equipment, plates bowls etc. Also numerous items of winter clothing, tools, ornaments etc etc. 

Saturday 19th July

I've had a slight leak from the accumulator under the sink so On Saturday i removed it and took it over to Graham's house to make use of his garage/workshop.
After renewing the brass fittings and applying plenty of PTFE tape to the threads of the fittings i re-assembled it and Graham and I refitted it on the boat. Time will tell if i've cured the problem.

The red accumulator tank is in the water supply from the pump to all taps.
Inside it has a 'bladder' which fills when you turn the tap off which basicaly means if you only run the tap for short periods the pump dosn't keep switching on and off or 'cycling' until the internal pressure in the accumulator drops.
What it means is, you get a smoother flow of water, and it's better for the pump pressure switch.

Monday, 16 June 2014

Its coming together nicely.

Sunday 15th and Monday 16th June

Sunday I was on my own. G and J had plans so after we had been out for a fried breakfast we went our separate ways and I made my way over to the marina.
First job Sunday, was to position the bilge pump and run the wiring from the battery to the pump.
 The pump I've used has an inbuilt float switch so is totally automatic, as soon as the water in the bilges reaches more than about 30 mm the float rises and switches on the pump thus ejecting the water. 'simples', as the water level decreases the float drops and switches the pump off. There is the facility to manualy switch on the pump if you wish but generally its automatic in operation. As i don't have a dedicated switch for the bilge pump yet, I havent used the third wire for the manual function but wired it permanently to the battery using the auto wiring. At least i can leave the boat safe in the knowledge if we have some torrential rain the pump will do its job.

Whilst down in the engine bay dabbling with the electrics I thought it would be a good idea to check the electrolyte level in the batteries as they're not usually very  accessible. All was ok there so thats another job jobbed!
Next job was to drill the holes in the deck plates in order to mount the port side storage box. Not too difficult as we'd already marked them out previously, but still a bit rough on the knees and leg muscles that hadn't recovered from Saturdays efforts! I managed to do the two outer bolts, but had to leave the two inner bolts for this morning (Monday) as i needed longer bolts.
Bolts acquired, job done.



I'm really pleased with the amount of work we've accomplished this trip. Unfortunately I need to get back to Kent tomorrow so I'll leave you with a picture of two doting parents and their offspring. Taken this morning just a little way along from my mooring.
Aaahhhh!
Bye for now.
 


Engine bay clean up, and hinging the deck plate.

Saturday 14th June.

After Friday's efforts at bleeding the fuel system the engine bay was a bit of a mess so first job was chuck some absorbent pads down the engine 'ole then, send Bro down the 'ole with some rags to do some mopping up. (well he's much more supple than I am, and can crawl right round the engine to get to the other side). Whilst he was down there he tightened up the skin fitting for the bilge pump outlet and fitted the outlet hose to the fitting with a jubilee clip ready for me to attach the pump when the wiring is in place.
Next job was to place the hinges in position for the engine hatch plate, and mark and centre punch ready to drill bolt holes.
This took a while so Bro disappeared off to another appointment leaving me to get on with it. (see, I do get my hands dirty sometimes). By the time he returned the job was well under way, and I'd also drilled the deck plates ready to bolt the starboard storage box in place. Also i'd drilled and fitted the lifting handle to the hatch plate.
Bolting everything  together was so much easier with two of us working together, and we soon had it sorted.


Having the hatch plate hinged makes life so much easier. Being able to open and shut the hatch, although still heavy, is now easily a one man job. The hinges are open so the hatch can be slid off the hinge pins for complete removal if necessary.
Time was getting on by then so we called it a day, a good day's work i felt and after all the climbing in and out, in and out of the engine 'ole my legs were protesting somewhat!

The trip back to Kings Bromley and some engine problems.

Friday 13th.

Tom, from the dry-dock phoned me on Thursday to say Bracken was all finished so they would be refloating her on Friday afternoon if I wanted to be there to see it happen. Well of course I wanted to be there! He said it would be around 3 pm so I arrived around 2 pm only to find Bracken already floating and moored outside the Swan! 
During the work that was carried out they'd had to drain the diesel from the tank, refill it with water whilst the welding was done, then drain the water out and refill with diesel when the work was completed. I started the engine and ran it up for a while whilst Tom and his lad finished refitting the rear rope fender 'button'

Lovely new blacking shows up the scruffy old paintwork.

You can see where a new strip of steel has been welded round the stern just above the waterline, this is why the diesel tank had to be drained.

As soon as G & J came home from work we shot over to Fradley to move Bracken back to Kings Bromley. Jenny met up with us and came aboard for the short cruise back and to assist with the locks.
We set off around 7.30, most other boats were moored for the night so we anticipated a nice quiet trip.
Unfortunately, just before the first lock out of Fradley the engine gave out a few 'clanks' and promptly died on us. "you'll have to bleed it" says Graham. 
"Hows that? I says.
"You've got some air in the system, crack the joint on one of the injectors, see if anything comes out" says Bro.
 I did that and nothing happened.
"there should be a bleed screw somewhere to get the air out of the system" he says.
Well I have to say I've worked on lots of petrol engines over the years but diesels are to me a total mystery. 
So i got down and dirty in the engine bay, not really knowing what i was looking for, until i spotted a knob. It just seemed to be begging to be turned, so I turned it while Bro cranked the engine over on the starter whereupon diesel and air was vented spluttering all over the place. As this was happening the engine started to fire up so I turned the knob in and the spluttering stopped and the engine ran ok! 

It's the yellow  knob, the other one is where you top up the oil.
(I think)

Once the engine was running ok we continued through the lock on up towards Kings Bromley.
I had to bleed it once more after we'd covered a few hundred yards, but after that it ran fine.
One boat came towards us which meant the next two locks were in our favour so that speeded things up a bit.
Wood End lock, clear run now.

Jenny fretting 'cos she's never done this before!

Getting the hang of it now.

Graham acting all nonshallant, nonshellant, carefree.

Nearly home now, moving the boat on the Friday eve was a good move as we now have the whole of Saturday to do some deck work.
More of that tomorrow.








Wednesday, 11 June 2014

Down in the dock

Tuesday 10th June.



Dry docked and pressure washed.

Not much old blacking left after pressure washing.

One of the welding jobs is to renew the socket the rudder sits in. You can see how worn the socket is.

Port side of hull, steelwork is quite sound.

The port side wear edge at the stern, another welding job is to replace the metal that's been worn away by the rudder banging against it as can be seen in next picture.

Starboard side wear edge, same problem.

Looking at the state of the blacking its hard to believe Bracken was last blacked only 12 months ago.
The reason it hasn't lasted is because the previous owner blacked over a layer of scale instead of removing it first. When my surveyor did the pre-purchase survey, in order to measure the steel thickness he hammered the side of the hull and some of the scale fell off taking the blacking with it.
The moral to the story being remove scale before blacking and don't black over loose or flaking rust or steel!